ACE-1 R/V SOUTHERN SURVEYOR STATUS FORM DATE/TIME (e.g 95111922): LOCATION PRESENT: LATITUDE: 41 59.47S LONGITUDE: 139 58.23E LOCATION -6 HOURS: LATITUDE: 41 59.82S LONGITUDE: 140 00.71E LOCATION -12 HOURS: LATITUDE: 41 34.33S LONGITUDE: 141 30.38E LOCATION -18 HOURS: LATITUDE: 41 23.88S LONGITUDE: 142 07.50E PRESENT WEATHER: 9 knot SE wind, pressure 1022.3 cloud 8/8 SEA STATE: slight 0.5m sea on a low 1 m easterly swell INSTRUMENTS/SYSTEMS STATUS 1 Sea Surface Measurements: All underway logging gear working well, present temp. 12.49C, salinity 34.89, fluoresence 426, depth 4980 m. Logging underway pCO2. 2 Routine Weather Observations: REMARKS: Going well. all weather balloons successfully launched 3 Carbon experiments Commenced process station number 2, currently using submersible pump at 80m. 5 Productivity measurements: REMARKS: started second 6 depth P vs I experiment 6 CTD Cast Schedule: REMARKS: all 14 completed ok. SPECIAL PLANNED OBSERVATIONS (NEXT 24-HOURS): complete second process station Trans-P1 and retrieve sediment trap at 20:00 hrs 20/11/95 GMT PAST 24-HR OPERATIONS SUMMARY: finished ES-1 site and steamed to Trans-P1. Arrived at P1 site at 16:00 hrs GMT. OTHER COMMENTS: working conditions are very pleasant at the moment.