ACE-1 R/V SOUTHERN SURVEYOR STATUS FORM DATE/TIME (95112518): PREPARED BY: Rudy Kloser LOCATION PRESENT: LATITUDE: 47 58S LONGITUDE: 145 45E LOCATION -6 HOURS: LATITUDE: 47 58S LONGITUDE: 145 37E LOCATION -12 HOURS: LATITUDE: 46 58S LONGITUDE: 145 41E LOCATION -18 HOURS: LATITUDE: 46 58S LONGITUDE: 143 45E PRESENT WEATHER: cloudy, 10 knot E wind, pressure 1014.0 hPa, cloud 8/8, 7.7C SEA STATE: slight 0.5m sea on a low 1.5 m S swell INSTRUMENTS/SYSTEMS STATUS 1 Sea Surface Measurements: All underway logging gear working well, present temp 9.4 C, salinity 34.16 ppt, fluorescence 227, depth 3414m. logging underway pCO2 nutrients and fluorescence. 2 Routine Weather Observations: all balloons launched OK. 3 Productivity measurements: completed fourth P vrs I experiment 4 CTD Cast Schedule: cable damage was experienced last night but a quick cable termination enabled our tight schedule to continue. SPECIAL PLANNED OBSERVATIONS (NEXT 24-HOURS): Steaming to Trans T-5 at 49S for a CTD dip to 1000m and then onto 53S PAST 24-HR OPERATIONS SUMMARY: Completed fourth process station at 18:30Z and steaming towards 49S OTHER COMMENTS: